Show patches with: Series = S/390: Rework instruction scheduling.       |    State = Action Required       |    Archived = No       |   7 patches
Patch Series S/W/F Date Submitter Delegate State
[7/7] S/390: Tune scheduling parameters. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[6/7] S/390: Add handling for group-of-two instructions. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[5/7] S/390: Add side to schedule-mix calculations. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[4/7] S/390: Change handling of group end. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[3/7] S/390: Change handling of long-running instructions. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[2/7] S/390: Add z14 pipeline description. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New
[1/7] S/390: Change z13 pipeline description. S/390: Rework instruction scheduling. 0 0 0 2019-03-11 Robin Dapp New